todo
house list as of december 2009:
- gutters (one down, four to go)
rough electrical re-inspected- thermostats and speaker wire
- insulation
- figure out interior wall options (reclaimed wood, plywood panels, drywall?) and install
- permit, purchase and install solar hot water panels
- design railings for stairs and balcony
- upstairs flooring
- design and order garage doors
- lighting fixtures
- plumbing fixtures
- built-in cabinetry
shed list
- install windows and final support beam
- install walls + siding
- design, build and install door
- design + build interior workshop
