todo

house list as of december 2009:

  1. gutters (one down, four to go)
  2. rough electrical re-inspected
  3. thermostats and speaker wire
  4. insulation
  5. figure out interior wall options (reclaimed wood, plywood panels, drywall?) and install
  6. permit, purchase and install solar hot water panels
  7. design railings for stairs and balcony
  8. upstairs flooring
  9. design and order garage doors
  10. lighting fixtures
  11. plumbing fixtures
  12. built-in cabinetry

shed list

  1. install windows and final support beam
  2. install walls + siding
  3. design, build and install door
  4. design + build interior workshop